Press Release from IDOT: Extensive Bridge Reconstruction Work Begins on Illinois Route 171

Extensive Bridge Reconstruction Work Begins on Illinois Route 171

(CHICAGO) The Illinois Department of Transportation (IDOT) announced that the $35 Million dollar bridge reconstruction work on Illinois Route 171 (First Ave) to repair all bridges on the southbound Illinois Route 171 will occur, weather permitting, starting March 30, with preliminary work beginning March 23.

OLYMPUS DIGITAL CAMERA

In order to complete the work, lanes will be reduced, weather permitting, with the following details:
On March 23, preliminary work will start on the northbound lanes to prepare for and
accommodate northbound and southbound traffic.

By March 30, all traffic will be on the northbound lanes of Illinois 171. All ramps on the southbound Illinois 171 will be closed to traffic during the entire duration of the project and detour routes will be posted.

Picture credit: Skycam9 from WGN Chicago.
Picture credit: Skycam9 from WGN Chicago.

The project is expected to be completed by October 31, 2015. Motorists can expect delays and should allow extra time for trips through this area.

Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.

Find details on other construction projects in IDOT’s District 1 at http://goo.gl/upgvZu. Updates on the impacts to traffic are available at www.travelmidwest.com.

Advertisements

Talk to me...

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s